HEIKO Metallbau has handed over another modern warehouse including sliding door to a satisfied customer. Turnkey from a single source, from earthworks and laying the foundations to assembly on site.

HEIKO Metallbau has successfully completed another extensive construction project and handed over a modern warehouse to a satisfied customer. The project underlines HEIKO Metallbau’s expertise in the planning, production and construction of industrial buildings from a single source.

The new hall, with an area of 300 square metres (20×15 m), was specially designed according to the customer’s requirements and is equipped with a practical sliding door. It offers optimum space for storage and logistics and fulfils all current standards in terms of safety and functionality.

From the initial planning phase to the turnkey handover, HEIKO Metallbau took over the complete project management. The project began with the careful design of the hall, followed by the manufacture of the required steel components in HEIKO Metallbau’s own factory. The earthworks and foundations were also carried out by the company’s experienced technicians.

“This project was another great opportunity to demonstrate our ability to deliver customised solutions in the field of industrial construction,” said Heiko Spiering, Managing Director of HEIKO Metallbau. “We are proud that we were able to complete this extensive project on time and to the complete satisfaction of our customer.”

Leave a Comment